25kW Micro Wind Install – USACE, Fort Riley, USA

USACE, VAWT, US Army

25kW Micro Wind Install – USACE, Fort Riley, USA

  • Current StatusComplete
  • Completion DateSeptember 2013
  • Project LeadJustin Phillips

Five 5kW grid-tied vertical-axis wind turbines are installed at a U.S. Army facility in Fort Riley Kansas. All related electronics are rack-mounted outside, showcasing the durability of the Sycamore Solution. To the best of Sycamore Energy’s knowledge, this wind turbine installation is the largest micro-wind turbine installation in North America. These turbines are pole mounted and increase the U.S. Army’s renewable energy footprint.